The EPC for RDCC Catalyst Cooler Project Part 2 Back Pressure Steam and Utilities System
| Location : | Rayong Province |
| Project Owner : | IRPC Public Company Limited |
| Contract Value : | Baht 492 million |
| Work Period : | 2017 – 2019 |
| Scope of Work : | EPCC for the UHV Modification Catalyst Cooler Project Part 2 Back Pressure Steam Turbine and Utilities System |