Owner : |
PTT Public Company Limited |
TRC’s Work Value : |
Baht 3,725 million |
Scope of Work : |
Recoating the existing 28-inch diameter pipeline (Route Code 400), separate into 2 sections as following; |
|
- Section 1 : from KP.12+100 toAMATACity Block Valve Station (approximately 35,400 M long)
- Section 2 : from BV#3 to BV#6 (approximately 57,216 M long)Total length : 92,616 M long
|
Project Location : |
From Amphur Mabkha, Rayong Province to Bangpakong Powerplant, Chonburi Province |
Work Period : |
Feb 2015 – Oct 2018 |