The Ditch Improvement, along Vibhavadi Rangsit Road Section 1, plus infrastructure of MEA (Electricity)
| Location : | Bangkok |
| Project Owner : | Department of Highways, Metropolitan Electricity Authority and Metropolitan Waterworks Authority |
| Contract Value : | Baht 714.38 million |
| Work Period : | 2019 - 2021 |
| Scope of Work : | Improvement of roadside drainage system of Vibhavadi Rangsit Road km.5+500.000 – km.10+700.00 (Highway Route No.31) and infrastructure. And construction of wells and underground electrical conduit. |