Navanakorn-Rangsit Interconnecting Gas Pipeline Project
Owner : | PTT Public Company Limited |
Contract Value : | Baht 834 million + USD 7.55 million (Equivalent of Baht 1,070 million) |
Construction Period : | Jul 2013 - Apr 2015 |
Project Description : | EPC package of diameter 28 inches for natural gas (6.2 km.) transmission branch from KP.20 of the PTP-NS pipeline to NVRS gas pipeline network including one metering and regulation station launcher/ receiver station |
Location : | Alongside Highway No.9, Chiengrak Noi, Bang Pa-in, Ayutthaya Province |