EPCC for new Incinerator Project
| Owner : | Trans Thai-Malaysia (Thailand) Limited |
| TRC’s Work Value : | Baht 917.09 million |
| Scope of Work : | Install the 2 of new incinerator package for 2 separation trains of existing gas separation plant. And bypass system to the existing incinerator in case of the new incinerator trip. |
| Work Location : | Chana District, Songkhla Province |
| Work Period : | Nov 2014 - Oct 2016 |