Who We Are Home Who We Are Our Projects Our Projects Type of Project All Pipeline Construction for Energy and Petrochemical Industry Process Plant Construction and Mechanical Installation for Energy and Petrochemical Industry Project Development and Investment Civil and Infrastructure Construction Select Year 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2011 2009 2008 2007 2006 2005 2004 1999 1997 1993 Location Map all projects The Design, Supply, Construction and Commissioning of Refined Glycerin Plant Project The 1st Transmission Pipeline Life Extension Project (PLLEP): Recoating Section (RC-400) The BV4.19 Pig Launcher and Receiver Installation Project The EPC for RDCC Catalyst Cooler Project Part 2 Back Pressure Steam and Utilities System Revamp LPG transfer Pump to Domestic BRP Ditch improvement Vibhavadi Rangsit RoadSection 3 Phase km.28+030.000 – km.30+300.00 Ditch improvement Vibhavadi Rangsit Road Section 1 Phase km.5+500.000 – km.10+700.00 BV4.19 Pig Launcher and Receiver Installation Project Raw Water PipelineSystem Klong Luang Reservoir-ChonburiProject (Water Pipeline and PumpStation) Highway Route No. 3304, connectingbetween Highway Route No. 315(Don Si Non)– Highway Route No. 331 (Plaeng Yao) Section 2 Conversion of Overhead Line to Underground System Project, Ratchadaphisek-Asoke Route Improvement of Pracharuamjai – Mitmaitri Road with Infrastructure « 1 2 3 4 5 6 »