เกี่ยวกับเรา

EPCC for new Incinerator Project

Owner : Trans Thai-Malaysia (Thailand) Limited
TRC’s Work Value : Baht 917.09 million
Scope of Work : Install the 2 of new incinerator package for 2 separation trains of existing gas separation plant. And bypass system to the existing incinerator in case of the new incinerator trip.
Work Location : Chana District, Songkhla Province
Work Period : Nov 2014 - Oct 2016